  • Typical start of an initial multiphase project
  • Typical text with approval text certification
  • Revised Applicant Certification 2023-06-19 113035
  • Clarification of installation of silt fence
  • Contractors have multiple platforms to meet requirements
  • This example using longitude latitude for submission
  • Current white copy of Certificate of Approval 2023-06-13 080658
  • Using a rain gauge can document many site conditions by the way the photo is framed
  • Progression of single lot construction from Diamonds Keep to Royal Pines
  • The evolving laws continue to assist with what is required
  • City generated form with information in excess of current state form
  • Prior to yellow copy Certificate of Approval
  • Continued installation of perimeter measures
  • Difference in NTU is apparent after 72 hours without treatment
  • Locations with dewatering location already identified
  • Miller Grading prior to compliance inspection for mass grading
  • From initial installation to compliance inspection authorization
  • From initial installation to compliance inspection authorization
  • Access for review of perimeter erosion control measures
  • Including treatment for anionic PAM
  • Groundcover establishing and slopes for anionic PAM treatments
  • New location construction was required due to groundwater
  • After dormancy, additional measures applied
  • After installation of turbidity curtain - additional cable required
  • Maintenance of existing controls on subdivision
  • Coir Baffle - Turbity Curtain Configuration after 2-inch rain event in less than 12 hours
  • After first construction entrance proved to be a problem, a new location was selected on the site
  • Based on rock discovered on the basin floor, a modified sediment basin had to be designed to compens
  • Construction of Sediment Basin before installation of functioning surface skimmer
  • Coir Baffle - Turbity Curtain Configuration after 2-inch rain event in less than 12 hours
  • Current Version of Certificate of Approval for ACE Integrated Stormwater Management Program 5/31/23