What is required for the issuance of a Certificate of Occupancy provided by Randolph County?

The City of Archdale currently has agreements with Randolph County and Guilford County for the issuance of a Certificate of Occupancy.  This Certificate of Occupancy is subject to the following:

a.    Public Works personnel have received the closed-circuit television (CCTV) video documentation provided by the contractor for subsurface conveyances.

b.    Public Works has verified condition of subsurface conveyances and have provided feedback for repairs; Typically, this review is scheduled between two and four weeks prior to the application of the final inch of asphalt on road surfaces which have subsurface pipes below.

c.    A walk through the site with the developer, design, professional, and city staff has occurred, and the list of items have been uploaded to See Click Fix.  Completed items will be changed from open (orange indicator) to closed (blue indicator).

d.    Once all the above is completed, the county will be notified indicating that all construction requirements have been met and a request to the State has been made for a Notice of Termination.

Show All Answers

1. What does the acronym “ACE” stand for?
2. How is the ACE Integrated Stormwater Management Program involved potential development?
3. During the initial stages, the developer will acknowledge and submit basic information for use in creating the project file.
4. How are the digital files provided by the developer/engineer used?
5. Why is the name of the project so specific?
6. What are common errors in the preparation of the Financial Responsibility/Ownership Form?
7. What are common errors on the Stormwater Agreement?
8. When do I get a yellow copy of the Certificate of Approval?
9. How often should See Click Fix be used for the project?
10. What is required for the issuance of a Certificate of Occupancy provided by Randolph County?
11. What is the purpose of the asset tabular table on phase construction drawings?
12. How are the permit Operation & Maintenance Plan(s) of the ACE Integrated Stormwater Management Plan affected by mandated revisions from NC State & the Environmental Protection Agency initiatives?
13. How is the current edition of AutoCAD submissions used by the City of Archdale?
14. Does the City of Archdale have a proprietary set of drawings for castings?
15. What typically happens when an unsealed AutoCad digital record drawing and AutoCad hard copy record drawing is submitted?
16. How can a contractor remove an erosion control fence during construction?
17. How does the "effectiveness of measure" relate to "making an effort?"
18. How do contractors' typically address sediment transport internal to a project site?